Factors affecting pollution referenda
Factors affecting pollution referenda
1.3 hrs read
Rate this book:
About This Book
Many local governments wanting to finance construction of water pollution control facilities through the sale of municipal bonds are required to obtain authorization from the electorate in the form of a bond referendum. Since defeat of such a bond issue can result in significant delay in implementation of the Federal Water Pollution Control Act, it is important that EPA understand the factors which affect the outcome of these elections. The study contains conclusions and recommendations about the process by which the project is planned, the role of the bond market, and the referendum as an approval mechanism for public expenditures.
Buy This Book
As an Amazon Associate and Bookshop.org affiliate, BookOrb earns from qualifying purchases.
Write a Review
Sign in to write a review.
More by Abt Associates.
A proposal to evaluate the soc
A proposal to evaluate the social and psychological costs of urban relocation
A study in child care 1970-71
A study in child care 1970-71
Accessibility of the metropoli
Accessibility of the metropolitan Washington, D.C., public transportation system to the handicapped and elderly
Applications of systems analys
Applications of systems analysis models
Arson prevention and control
Arson prevention and control
Community crime prevention pro
Community crime prevention program, Seattle, Washington