Construction scheduling, cost optimization, and management
Rate this book:
About This Book
This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.
Buy This Book
As an Amazon Associate and Bookshop.org affiliate, BookOrb earns from qualifying purchases.
Write a Review
Sign in to write a review.
More by Hojjat Adeli
A methodology for the evaluati
A methodology for the evaluation of structural design software for DOS-based microcomputers
Advances in computer science and information technology
Advances in design optimizaton [sic]
Control, optimization, and smart structures
Distributed computer-aided engineering
Expert systems for structural design