Combined treatment of municipal kraft linerboard, and fiberb
Combined treatment of municipal kraft linerboard, and fiberboard manufacturing wastes
30 min read
Rate this book:
About This Book
An experimental 120 gpm pilot treatment plant was used to treat a combined waste composed of municipal sewage, wastewater from a Kraft linerboard mill and wastewater from a groundwood-cold extraction caustic insulation board mill. The pilot plant included combined and/or separate primary sedimentation units, followed by one secondary system consisting of 24 to 30 hrs of extended aeration, and one high rate plastic media trickling filter followed by 12-15 hrs of aeration. The two secondary treatment systems operated in parallel, receiving one-half of the total flow in each, and both systems had secondary sedimentation and sludge return. The pilot plant achieved in excess of 90% BOD removal, with no supplemental nutrient additions needed. Total estimated operating and capital costs for the combined treatment are given.
Buy This Book
As an Amazon Associate and Bookshop.org affiliate, BookOrb earns from qualifying purchases.
Write a Review
Sign in to write a review.