If you liked MOST for construction scheduling by Anthony L. Iannone, start with Construction scheduling simplified (1985) and Management program planning and control with PERT, MOST and LOB (1967). These recommendations are drawn from the same author, shared genres, and reader overlap on BookOrb.

Back to MOST for construction scheduling · Anthony L. Iannone books in order

Recommended next reads

  1. 1 Construction scheduling simplified 1985 · 202 pages · Anthony L. Iannone · Same author
  2. 2 Management program planning and control with PERT, MOST and LOB 1967 · 202 pages · Anthony L. Iannone · Same author

Frequently asked questions

What should I read after MOST for construction scheduling?

BookOrb recommends Construction scheduling simplified (1985) and Management program planning and control with PERT, MOST and LOB (1967).

Are there books like MOST for construction scheduling?

Yes. The list on this page is ranked from the closest matches BookOrb has for MOST for construction scheduling.

Who wrote MOST for construction scheduling?

MOST for construction scheduling is by Anthony L. Iannone.