Concrete overlay field application program
Concrete overlay field application program
24 min read
Rate this book:
About This Book
The National Concrete Pavement Technology Center, Iowa Department of Transportation, and Federal Highway Administration set out to demonstrate and document the design and construction of portland cement concrete (PCC) overlays on two-lane roadways while maintaining two-way traffic. An 18.82 mile project was selected for 2011 construction in northeast Iowa on US 18 between Fredericksburg and West Union. This report documents planning, design, and construction of the project and lessons learned. The work included the addition of subdrains, full-depth patching, bridge approach replacement, and drainage structural repair and cleaning prior to overlay construction. The paving involved surface preparation by milling to grade and the placement of a 4.5 inch PCC overlay and 4 foot of widening to the existing pavement. In addition, the report makes recommendations on ways to improve the process for future concrete overlays.
Buy This Book
As an Amazon Associate and Bookshop.org affiliate, BookOrb earns from qualifying purchases.
Write a Review
Sign in to write a review.
More by Cable, James K.
Demonstration and field evalua
Demonstration and field evaluation of alternative Portland cement concrete pavement reinforcement materials
Design and construction proced
Design and construction procedures for concrete overlay and widening of existing pavements
Evaluation of unbonded ultrath
Evaluation of unbonded ultrathin whitetopping of brick streets
Field evaluation of elliptical
Field evaluation of elliptical steel dowel performance
Impact of pavement type on cou
Impact of pavement type on county road systems
Two-lift Portland cement concr
Two-lift Portland cement concrete pavements to meet public needs